FIRST TECHNOLOGY AETRA

  • 28th April 2010
JAKARTA, 28/4 - AETRA FIRST TECHNOLOGY. PT Aetra Air Jakarta officer, performed a long pipe replacement process with a temporary cheek and open-close (plugging) on a water pipe while diameter 1650mm, in the East Flood Canal area, Jakarta, Wednesday (28/4). Aetra conducts the transfer of the main transmission pipeline that connects the Installation of Water Treatment (IPA) Buaran with the Cilincing Distribution Center, without conducting the termination of water supply through the help of the new plugging technology first applied in Southeast Asia for water pipes, during this on oil and gas pipes. ANTARA/Audy Alwi/ama/10
Related photo
Standard
Image information
Image size
2048x1403
File size
611.6 KB
Created
28/04/2010 16:10 WIB
Photographer
Audy Alwi
Editor