DISASSEMBLING OF BUILDINGS IS NOT CRAFTED AT THE TOP OF THE BOGOR
The officer with heavy equipment dismantling the building is not crafted in Naringgul Village, Puncak, Bogor, West Java, Wednesday (4/9/2019). The two-stage building dismantling has the Permit of the Building (IMB) executed 25 buildings of the house that had previously been dismantled by 30 buildings on (28/8/2019) ago. ANTARA PHOTO/Yulius Satria Wijaya/hp.
Related photo