THE INAUGURATION OF THE SECOND TURBINE PLTA ROGUN IN TAJIKISTAN
The president of Tajikistan Emomali Rahmon (the right five) combined with workers when the inauguration of the operation of the second turbine of the Water Power Plant (PLTA) Rogun, Tajikistan, Monday (9/9/2019). The Tajikistan government inaugurates the second turbine of Rogun’s six turbines planned with the capacity of each turbine of 600 MW. The six turbine construction is expected to be completed in 2028 with a total capacity of 3600 MW. ANTARA PHOTO/Prasetyo Utomo/foc.
Related photo