POSTBANJIR INFRASTRUCTURE RECOVERY

  • 9th January 2020
The officers repair damaged electrical networks affected by flooding bandang in Jaha Village, Banjar Irrigation, Lebak, Banten, Thursday (9/1/2020). In difficult terrain conditions due to longsor roads as well as the government break bridges seek to recover infrastructure facilities including road repair and bridge targeted by President Joko Widodo must be completed within 3-4 months ahead. ANTARA PHOTO/Asep Fathulrahman/aww.
Related photo
Standard
Image information
Image size
2667x4000
File size
2.53 MB
Created
09/01/2020 14:05 WIB
Photographer
Asep Fathulrahman
Editor
Andika Wahyu