DISASSEMBLED STADIUM ANDI MATTALATTA THENSSAR

  • 21st October 2020
Worker with heavy equipment performs the disassembling of the Mattoangin Andi Mattalatta Stadium in Makassar, South Sulawesi, Wednesday (21/10/2020). The disassembling of the stadium built in 1957 with a land area of 7.5 hectares and become the headquarters of the Makassar PSM will be renovated using the APBD of Rp200 billion and targeted early 2022. ANTARA PHOTO/Abriawan Abhe/wsj.
Related photo
Standard
Image information
Image size
4000x2640
File size
2.59 MB
Created
21/10/2020 10:25 WIB
Photographer
Abriawan Abhe
Editor
Widodo S Jusuf