NATIONAL MIGAS PRODUCTION TARGET
A ship docked around the floating station supply of oil and offshore gas in the waters of the Balloongan, Indramayu, West Java, Wednesday (11/11/2020). SKK Migas targeted in 2030 production of petroleum 1 million barrels of oil per day (BOPD) and natural gas of 12 billion standard cubic feet per day (BSCFD), or in total of 3.2 million barrels equivalent oil per day (BOEPD). ANTARA PHOTO/Dedhez Fencing/hp.
Related photo