FLOOD CONTROLLING PROJECT IN BANDUNG DISTRICT

  • 3rd December 2020 GMT+7
Workers operate heavy equipment to complete the Cisangkuy river flood controller project in Rancatungku Village, Pameungpeuk, Bandung District, West Java, Thursday (3/12/2020). The Cisangkuy River flood controller project has a total length of 1.75 kilometers and can hold 225 cubic meters per second it is intended to reduce the load of the Citarum River tampung as well as the wincal floods in the Kamasan and Banjaran region, Bandung Regency. ANTARA PHOTO/Raisan Al Farisi/wsj.
Related photo
Standard
Image information
Image size
4000x2662
File size
2.06 MB
Created
03/12/2020 15:00 WIB
Photographer
Raisan Al Farisi
Editor
Widodo S Jusuf