DREDGING SIDE C CAKUNG RESERVOIR

  • 14th December 2020 GMT+7
A number of heavy equipments of Air Power Department (SDA) Jakarta Timur conducts side C Jakarta Garden City (JGC), Cakung, East Jakarta, Monday (14/12/2020). Dredging is done in approximately two meters to accommodate maximum water discharge and minimize floods in the region. ANTARA PHOTO/Suwandy/rwa.
Related photo
Standard
Image information
Image size
4000x2667
File size
1.36 MB
Created
14/12/2020 21:10 WIB
Photographer
Suwandy
Editor
Puspa Perwitasari