MOLOR PROJECT IMPACT

  • 4th January 2011 GMT+7
DAMPAK PROJECT MOLOR. A heavy tool conducts the dredging of the river base on the culvert project (box culvert) stage II area Banyuurip, Surabaya, Tuesday (4/1). The II stage culvert box project with a length of about 2.008 km and a budget worth Rp 97.1 billion, the workmanship has a kemoloran, so when the rain falls the area around the flooded project three times higher. ANTARA/M Risyal Hidayat/ed/ama/10
Related photo
Standard
Image information
Image size
3872x2592
File size
1.24 MB
Created
04/01/2011 18:35 WIB
Photographer
M Risyal Hidayat
Editor