PELVIC BOOSTER

  • 7th January 2011 GMT+7
SIDOARJO, 7/1 - TANGGUL SHIPPING. A number of heavy equipments conducting the manufacturing of the strengthening of Lapindo’s hot sludges. in Jatirejo Village, Sidoarjo, Thursday (7/1). Sidoarjo (BPLS) sludge management body, continues to strengthen the sludge shardening embankment, imposes a potentially due to the tanggul trap. PHOTO ANTARA/Eric Ireng/ss/mes/11
Related photo
Standard
Image information
Image size
3648x2392
File size
1.1 MB
Created
07/01/2011 16:10 WIB
Photographer
Eric Ireng
Editor