REPAIR OF MOLINTOGUPO BRIDGE

  • 14th January 2021 GMT+7
Photo aerial Bridge Molintogupo that has been completed in Suwawawawa, Bone Ballngo Regency, Gorontalo, Thursday (14/1/2021). The South Suwawa Sub-district connecting bridge and the Middle Suwawawa was previously ambruk was held flooded in June 2020. ANTARA PHOTO/Adiwinata Solihin/foc.
Related photo
Standard
Image information
Image size
3000x2001
File size
1.97 MB
Created
14/01/2021 15:35 WIB
Photographer
Adiwinata Solihin
Editor
Fanny Octavianus