PREPARATION OF OPERATION TOLL ROAD HOT DRILLS 3A

  • 29th January 2021 GMT+7
The motor rider crosses next to Jalan Tol Bogor Outer Ring Road (BORR) Sweet Wood Toll Gate 2, Bogor City, West Java, Friday (29/1/2021). PT Marga Sarana Jabar (MSJ) as the management of Jalan Tol BORR will operate a hot 3A ruas Simpang Yasmin-Simpang Semplak along 2,85 km while imposeing a new tariff toll BORR is calculated from January 30, 2021 at 00.00 WIB. ANTARA PHOTO/Arif Firmansyah/rwa.
Related photo
Standard
Image information
Image size
2678x4000
File size
1.78 MB
Created
29/01/2021 22:00 WIB
Photographer
Arif Firmansyah
Editor
Puspa Perwitasari