POTENTIAL EBT DEVELOPMENT IN NTB
Workers clean the Solar Power Generation panels (PLTS) in Sengkol Village, Pujut District, Praya, Central Lombok, NTB, Tuesday (2/2/2021). Based on PLN NTB data for the potential of New Energy Development (EBT) in NTB recorded by 102.74 MW with a wide variety of EBT sources namely water (PLTM and PLTA), bayu or wind (PLTB), solar power (PLTS), biomass (PLTBm) and sea flow (PLTAL) where from the total potential is 41.38 MW is on Sumbawa island, 21.36 MW in Lombok Island and each of 10 MW is in Lombok Strait and Alas. ANTARA PHOTO/Ahmad Subaidi/foc.
Related photo