POTENTIAL EBT DEVELOPMENT IN NTB

  • 2nd February 2021
Photos of the Solar Power Generation area (PLTS) in Sengkol Village, Pujut District, Praya, Central Lombok, NTB, Tuesday (2/1/2021). Based on PLN NTB data for the potential of New Energy Development (EBT) in NTB recorded by 102.74 MW with a wide variety of EBT sources namely water (PLTM and PLTA), bayu or wind (PLTB), solar power (PLTS), biomass (PLTBm) and sea flow (PLTAL) where from the total potential is 41.38 MW is on Sumbawa island, 21.36 MW in Lombok Island and each of 10 MW is in Lombok Strait and Alas. ANTARA PHOTO/Ahmad Subaidi/foc.
Related photo
Standard
Image information
Image size
4048x2485
File size
2.6 MB
Created
02/02/2021 12:20 WIB
Photographer
Ahmad Subaidi
Editor
Fanny Octavianus