ELECTRICITY INFRASTRUCTURE SUPPORTING MOTOGP MANDALIKA

  • 2nd February 2021 GMT+7
The officer conducts electrical checks in Gardu Induk Kuta in Special Economic Area (KEK) Mandalika, Pujut, Praya, Central Lombok, NTB, Tuesday (2/2/2021). PLN builds electrical infrastructure including Gardu Induk Sengkol with a capacity of 120 Megavolt Ampere (MVA) and Gardu Induk capacity of 30 Megavolt Ampere (MVA) in Kuta Mandalika area to support the power needs of the MotoGP Mandalika circuit of 5.2 MW.ANTARA PHOTO/Ahmad Subaidi/foc.
Related photo
Standard
Image information
Image size
4048x2727
File size
2.85 MB
Created
02/02/2021 13:30 WIB
Photographer
Ahmad Subaidi
Editor
Fanny Octavianus