SMELTING TREATMENT OF WEEKLY MUD GAS

  • 13th February 2021 GMT+7
The air condition where smelting gas is mixed in Pondok Pesantren Al-Ihsan, Pekanbaru City, Riau, Saturday (13/2/2021). The ESDM Riau Department team and the EMP Bentu gas company began to carry a six-meter hole closure process and the depth is estimated about 119 meters, after ensuring the harmful gas and mud smelting has stopped. ANTARA PHOTO/FB Anggoro/hp.
Related photo
Standard
Image information
Image size
4000x2666
File size
2.47 MB
Created
13/02/2021 12:35 WIB
Photographer
Fb Anggoro
Editor
Hermanus Prihatna