CONSTRUCTION OF ROAD TRAFFIC SUMATERA BRIDGE

  • 7th March 2021
The vehicle crosses Merangin Bridge next to the construction of Merangin 2 Bridge on Jalan Lintas Sumatra Jambi-Sumbar, Bangko, Merangin, Jambi, Sunday (7/3/2021). The construction of the bridge above the river stream of the Merangin Rod and the River of the Mesumai Rod with the project value of Rp58 billion from the APBN is targeted finished in this year. ANTARA PHOTO/Wahdi Septiawan/rwa.
Related photo
Standard
Image information
Image size
4000x2710
File size
2.35 MB
Created
07/03/2021 12:05 WIB
Photographer
Wahdi Septiawan
Editor
Puspa Perwitasari