OPERATION OF THE PASSENGER SHIP IN THE NORMAL DUMAI PORT
A number of ship passengers from Riau Islands arrive at the Port of Sri Junjungan Dumai, Riau, Wednesday (19/5/2021). The operation of the passenger ship is normal in the Dumai Port after the end of the shortening period on May 17, 2021 and the passenger’s turning current spikes is transported using two boat fleets arriving at the port. ANTARA PHOTO/Aswaddy Hamid/rwa.
Related photo