OPERATION OF LAHENDONG PLTP
Employees conduct supervision in the control room of the Earth’s Power Generation (PLTP) Lahendong, Tomohon, North Sulawesi, Thursday (29/7/2021). The first PLTP in Sulut was gradually built in 2001-2011 has four plants and has been fully operating with a maximum capacity of 4x20 Mega Watt (MW), as well as able to serve 60,000-80.000 homes with an average range of power 1.300 VA in North Sulawesi region - Gorontalo. ANTARA PHOTO/Adwit B Pramono/rwa.
Related photo