INTIFADHOH DAYS

  • 28th September 2007 GMT+7
SIDOARJO, 28/7 - PERBAIKI PIPE. The workers make the repair of the broken PDAM pipe caused by a decrease in soil in Porong,Sidoarjo, East Java Jum'at (28/9). PDAM pipes with diameter 65 Cm and flow 110 liters per second clean water from Pasuruan Umbulan for Surabaya and Sidoarjo broke since Wednesday night (26/9). ANTARA/HADIYANTO/NZ/07
Related photo
Standard
Image information
Image size
2048x1357
File size
483.55 KB
Created
28/09/2007 16:03 WIB
Photographer
Hadiyanto
Editor