ELECTRICAL INSTALLATION INSPECTION PRISON

  • 10th September 2021
A number of PLN officers discussed with a driver when conducting electrical installation inspections at the Prison House (Rutan) Class IIB Serang, Banten, Friday (10/9/2021). The thorough check of the electrical installation is carried out in accordance with the instructions of Understanding Yasonna Laoly to anticipate the occurrence of hazards such as electric short circuits (short connections) that can result in fires. ANTARA PHOTO/Asep Fathulrahman/foc.
Related photo
Standard
Image information
Image size
4000x2824
File size
2.06 MB
Created
10/09/2021 13:30 WIB
Photographer
Asep Fathulrahman
Editor
Fanny Octavianus