NEW RENEWABLE ENERGY INFRASTRUCTURE DEVELOPMENT
A number of workers are above the turbine drive dam in the Sulewana PLTA managed by PT Poso Energy in Poso Regency, Central Sulawesi, Friday (1/10/2021). The Ministry of ESDM in the Grand National Energy Strategies (GSEN) will increase the renewable capacity of new renewable energy generations (EBT) of 38 Giga Watt to 2035 among others with the development of water power generation infrastructure. ANTARAFOTO/Basri Marzuki/aww.
Related photo