PLTS FOR IRRIGATION SAWAH

  • 1st December 2021 GMT+7
Head Dusun checked the condition of solar panels in Solar Power Panel Station, Dusun Butan Nambar, Talawi Mudiak, Sawahlunto, West Sumatra, Wednesday (1/12/2021). PT Bukit Asam Tbk’s solar power panel station helps to enquire 62 hectares of public rainfall rice fields with harvest results reach a thousand tons per year, increased drastically from previous only 248 tons per year. ANTARA PHOTO/Iggoy el Fitra/wsj.
Related photo
Standard
Image information
Image size
4000x2667
File size
2.88 MB
Created
01/12/2021 18:20 WIB
Photographer
Iggoy El Fitra
Editor
Widodo S Jusuf