RESIDENTIAL BRIDGE
MAGELANG 25/6 - PARTICULAR EQUIPMENT. The Minister of Public Works Djoko Kirmanto (left) listens to an explanation on the technical construction of the Pabelan A bridge in Muntilan, Magelang, Jateng, Saturday (25/6). The ambrol Pabelan Bridge is extended by the flooding of the cold lava Merapi on (30/3) then it has been completed with a length of 60 m, a height of 5,5, and a width of 9 meters with the Trans Australia steel frame and the cost of Rp 25 billion from the National Agency fund of Disaster Management (BNPB). ANTARA/Anis Efizudin/ed/pd/11
Related photo