TARGET ADDED POWER PLANT CAPACITY 2030
A number of workers installed electrical power transmission network in Gowa Regency, South Sulawesi, Thursday (2/12/2021). The government through PT PLN (Persero) targets the added capacity of power plants at 2030 reaches 40,9 gigawatt and requires additional power transmission network about 47 thousand kilometers circuit (kms). ANTARA PHOTO/Arnas Padda/yu/hp.
Related photo