OPERATION OF RETENTION POOL

  • 21 Januari 2022 12:05
Andir retention pools at Andir, Baleendah, Bandung Regency, West Java, Friday (21/1/2022). The Ministry of PUPR has contemplated the construction of the Andir retention pool with a water catch area of 149 hectares by equipped 3 units of 500 liters/second-capacity pump and able to accommodate the forest flood of the Citarum River as much as 160 thousand cubic meters. ANTARA PHOTO/Raisan Al Farisi/nym.
Related photo
Standard
Image information
Image size
4000x2462
File size
3.28 MB
Created
21/01/2022 12:05 WIB
Photographer
Raisan Al Farisi
Editor
Nyoman Budhiyana