OIL PRODUCTION TARAKAN

  • 29th July 2011
ARAKAN, 29/7 - ITS PRODUCTS. The officer checked the well condition of angguk pump (conventional), in the Pertamina EP Tarakan field, East Kalimantan, Friday (29/7). From four areas of drilling, Pamusian, Juata, Sesanip, Menganta, with 47 aggru pumps (conventional) and 15 hydraulic pumps (hpu), the Tarakan field is able to produce 628 barrels per day (BPOD) that has exceeded the production target per end of June 2011 namely 592 BPOD. ANTARA/Yudhi Mahatma/ss/11
Related photo
Standard
Image information
Image size
3000x1966
File size
512.76 KB
Created
29/07/2011 22:30 WIB
Photographer
Yudhi Mahatma
Editor