CALCULATE THE VOLUME OF MUDIC CURRENT

  • 25th August 2011 GMT+7
INDRAMAYU, 25/8 - HITUNG VOLUME ARUS MUDIK. The officer calculated the volume of vehicles used for the mud at the intersection of Celeng, Loh Bener, Indramayu, West Java, Thursday (25/8). The mud flow on the pantura path is estimated to reach the peak at H-4 and H-3 Width. PHOTO ANTARA/Perwitasari/nz/11
Related photo
Standard
Image information
Image size
3000x1996
File size
1.08 MB
Created
25/08/2011 20:25 WIB
Photographer
Puspa Perwitasari
Editor