EVAPORATION OF THE RAILWAY FLEET PT KAI DAOP 4 A WIDE RIDGE PERIOD

  • 22nd April 2022
The officer cleans passenger train circuit at Semarang Tawang Station, Central Java, Friday (22/4/2022). PT KAI Operation Area (Daop) 4 Semarang prepares 16 train travels every day, by supporting 14 locomotives and 100 train circuits for economic, executive, and train generations, as well as local lines Kedungsepur prepared 6 diesel railways as passenger spike anticipation in Lebaran’s mud period. ANTARA PHOTO/Aji Styawan/hp.
Related photo
Standard
Image information
Image size
4000x2667
File size
2.05 MB
Created
22/04/2022 16:40 WIB
Photographer
Aji Styawan
Editor
Hermanus Prihatna