PETROLEUM POWER PLANT PERTAMINA

  • 25th April 2022 GMT+7
President Director of PT Pertamina Nicke Widyawati (center) accompanied by President Director of Pertamina Power Indonesia (Subholding PNRE Pertamina Dannif Danusaputro (left) Operation Director of OGE Pertamina Eko Agung Bramantyo (right) received an explanation when reviewing areas in the geothermal power generation (PLTP) Binary Organic Rankine Cycle (ORC) capacity 500 KW managed by PT Pertamina Geothermal Energy (PGE) at Lahendong, Tomohon, North Sulawesi, Monday (25/4/2022). The geothermal power generation (PLTP) Binary Organic Rankine Cycle (ORC) is a pilot project for the application of binary technology or optimization of hot water vapor from Lahendong geothermal wells for electricity production, and PT Pertamina Geothermal Energy (PGE) plans to moisten the binary PLTP with capacity reaching 25 MW as a commitment to realizing new and bible energy sources. ANTARA PHOTO/Reno Esnir/YU
Related photo
Standard
Image information
Image size
4000x2749
File size
2.79 MB
Created
25/04/2022 19:00 WIB
Photographer
Reno Esnir
Editor
Yusran Uccang