MUD CURRENT AT THE HARBOR PORT STARTS ARMG
A vehicle prepares a crossing boat at Merak Port, Banten, Sunday (1/5/2022). The mud flow at H-1 width at Merak harbor is monitored armg and there is no vehicle or passenger stacking. ANTARA PHOTO/Akbar Nugroho Gumay/wsj.
Related photo