HIGH VOLTAGE SYSTEM ELECTRICAL LOMBOK

  • 13th June 2022 GMT+7
The worker's air photo conducts the transmission of the High Voltage Air Channel cable (SUTT) 150 kV in Kuta Village, Pujut District, Central Lombok, NTB, Monday (13/6/2022). PLN Nusa Tenggara Construction Induk Unit has completed the construction of the Looping system of high voltage 150 kilo Volt (kV) of Lombok electricity with investment value of more than 1.75 Triliun which is attached to the Lombok Island along 522 kilo meters circuit (kms). ANTARA PHOTO/Ahmad Subaidi/nz
Related photo
Standard
Image information
Image size
4048x2462
File size
3.27 MB
Created
13/06/2022 11:45 WIB
Photographer
Ahmad Subaidi
Editor
Zarqoni Maksum