GRIDER BOX PROJECT KCJB
The President Director of PT KCIC Dwiyana Slamet Riyadi when providing a welcome to the installation event of the CY#1 box at the construction of the Jakarta-Bandung Rapid Train Project (KCJB) in Jatibening, Bekasi, West Java, Monday (27/6/2022). The installation of girder box direction Jakarta or Bandung project KCJB has been completed with a total of 1018 girder box produced in Casting Yard 1 and overall physical development has reached 76 percent. ANTARA PHOTO/Fakhri Hermansyah
Related photo