GRIDER BOX PROJECT KCJB

  • 27th June 2022
The President Director of PT KCIC Dwiyana Slamet Riyadi when providing a welcome to the installation event of the CY#1 box at the construction of the Jakarta-Bandung Rapid Train Project (KCJB) in Jatibening, Bekasi, West Java, Monday (27/6/2022). The installation of girder box direction Jakarta or Bandung project KCJB has been completed with a total of 1018 girder box produced in Casting Yard 1 and overall physical development has reached 76 percent. ANTARA PHOTO/Fakhri Hermansyah
Related photo
Standard
Image information
Image size
4000x2666
File size
1.58 MB
Created
27/06/2022 14:55 WIB
Photographer
Fakhri Hermansyah
Editor