POWER CONSUMPTION

  • 14th October 2011 GMT+7
JAKARTA, 14/10 - ELECTRIC CONSUMMER. PLN officer conducts maintenance in 150 KV transmission tower in Gatot Subroto Road, Jakarta, Friday (14/10). Power consumption at peak load time (WBP) in Java Bali penetrated the figure 19.300 megawatt (MW) while the average power of the plant on the Java electricity interconnect system reached approximately 21.000 MW.FOTO ANTARA/Rosa Panggabean/Spt/11.
Related photo
Standard
Image information
Image size
3000x1993
File size
1.2 MB
Created
14/10/2011 17:40 WIB
Photographer
Rosa Panggabean
Editor