PUSH TIMES
SIDOARJO, 6/11 - PORONG BACKGROUND. The Pendangkalan Kali Porong, Sidoarjo, East Java Tuesday (6/11) along the 15 Km caused by the disposal of Lapindo Brantas heat mud can not be reached quickly because the dredging is only carried out with two heavy equipment eskavator.Air in Kali Porong has started to flow, but the river can cause flood. ANTARA/Hadiyanto/Koz/hp/07.
Related photo