UTILIZATION OF PLTS FOR CAMPUS
Technicians of solar panels on the installation of Solar Power Generation (PLTS) on the campus of the Institute of National Technology (ITN) Malang, East Java, Thursday (7/7/2022). The PLTS uses a connected system with PLN electrical networks or called On Grid installation utilizes 1.111 solar panels and is able to produce flat electricity energy per day of 2,250 kWh used to meet the needs of ITN campus. ANTARA FOTO/Ari Bowo Sucipto/rwa.
Related photo