UTILIZATION OF PLTS FOR CAMPUS

  • 7th July 2022 GMT+7
Technicians install solar radiation sensors on solar panels on the installation of Solar Power Generation (PLTS) on the campus of the Institute of National Technology (ITN) Malang, East Java, Thursday (7/7/2022). The PLTS uses a connected system with PLN electrical networks or called On Grid installation utilizes 1.111 solar panels and is able to produce flat electricity energy per day of 2,250 kWh used to meet the needs of ITN campus. ANTARA FOTO/Ari Bowo Sucipto/rwa.
Related photo
Standard
Image information
Image size
3456x2304
File size
2.91 MB
Created
07/07/2022 13:20 WIB
Photographer
Ari Bowo Sucipto
Editor
Puspa Perwitasari