PLTMH USE IN MUHAMMADIYAH UNIVERSITY

  • 2nd August 2022 GMT+7
A technician conducts regular maintenance in the river water shelter pool which is a series of installation of Hydro Power Plant (PLTMH) on the campus of the University of Muhammadiyah Malang (UMM), East Java, Tuesday (2/8/2022). The 120 kilo watts capacity PLTMH is used to supply electricity needs in the campus area. ANTARA PHOTO/Ari Bowo Holypto/wsj.
Related photo
Standard
Image information
Image size
3456x2304
File size
2.7 MB
Created
02/08/2022 14:42 WIB
Photographer
Ari Bowo Sucipto
Editor
Widodo S Jusuf