NORMALIZATION PROGRESS
Heavy equipment air photo eskavator complete the normalization project Kali Bekasi package 1 at Pondok Gede, Bekasi, West Java, Saturday (20/8/2022). The Ministry of PUPR through the Cisadane River Large Hall (BBWSCC) conducts the control of Flood Kali Bekasi package 1 that has reached 50 percent and targeted finished in 2023. ANTARA PHOTO/Fakhri Hermansyah/foc.
Related photo