HEALTH FOR PLTA

  • 11th November 2022 GMT+7
Workers operate ships to drove material on the basis of Lake Poso, Poso Regency, Central Sulawesi, Friday (11/11/2022). The dredging is done to increase the discharge of the lake water to rotate the turbine of the Water Power Plant (PLTA) around the lake. ANTARA PHOTO/Basri Marzuki/YU
Related photo
Standard
Image information
Image size
4000x2666
File size
1.9 MB
Created
11/11/2022 17:40 WIB
Photographer
Basri Marzuki
Editor
Yusran Uccang