PERESMIAN ENERGY WADUK MUARA NUSA DUA

  • 11th November 2022
The officer conducts the treatment of solar power generation inauguration system (PLTS) Floating Muara Nusa Dua reservoir in Badung Regency, Bali, Friday (11/11/2022). The 100 Kwp-capacity PLTS is built to support the electricity supply of KTT G20 as well as the form of Indonesia’s commitment in supporting renewable and sustainable economic programs. ANTARA PHOTO/Media Center G20 Indonesia/Aditya Pradana Putra/nym.
Related photo
Standard
Image information
Image size
4000x2662
File size
1.13 MB
Created
11/11/2022 19:10 WIB
Photographer
Aditya Pradana Putra
Editor
Nyoman Budhiyana