TEST COBA JALAN TOL SEMARANG-DEMAK SEKSI II
An air photo of a four-wheeled vehicle on Jalan Tol Semarang-Dupa Sexy II ruas Sayung-Dupa in Demak District, Central Java, Sunday (13/11/2022). The 1st toll road trial lasted 12 November to 2 December with 12-17 November operational schedule at 06.00-10.00 WIB from the direction of Demak to Semarang, at 15:00-18.00 WIB from Semarang to Demak, and on 18-2 December at 06.00-18.00 WIB opened two directions as an attempt to decompose congestion on the Pantura Semarang-Dupa line. ANTARA PHOTO/Aji Styawan/nz.
Related photo