INFRASTRUCTION OF GAS PIPE GAS BUMI JALUR SEMARANG BATANG

  • 6th December 2022
Director of Infrastructure and PGN Achmad Muchtasyar Technology (left fifth) accompanied by Plt. Deputy Assistant Migas, Mining and Petrochemical Ministry of Coordinator of Sunandar Economic Affairs (left faculty), Deputy of Regional Development Coordination and Ministry of Coordinator for Economic Affairs of Wahyu Utomo (left seven), coordinator of Migas Agung Kuswardono (left eight), and the Head of Energy and Mineral Resources of Central Java Province Sujarwanto Dwiatmoko (left skills) saw the first gas process, or the first Gas Pipe Welding, and the first Gas Pipe Welding Machine, and the first Gas Pipe Welding Machine. Subholding Gas Pertamina PT. PGN builds petroleum pipeline infrastructure from Mangkang, Semarang to Rod passing the Kendal Industrial Area (KIK) with the utilization of Cirebon-Semarang transmission pipes with distribution pipes along 8 kilometers of 8 inch diameter with 13 MMSCFD gas transportation capacity which will be absorbed by 7 KIK customers with the needs of about 3,4 to 4 BBTUD. ANTARA PHOTO/Harviyan Prime Son/rwa.
Related photo
Standard
Image information
Image size
4000x2672
File size
1.65 MB
Created
06/12/2022 15:15 WIB
Photographer
Harviyan Perdana Putra
Editor
Puspa Perwitasari