OIL PRODUCTION FACILITIES.

  • 6th December 2011 GMT+7
BOJONEGORO, 6/12 - MINYA PRODUCTION RESULTS. Minister of ESDM Jero Wacik (three left) along the Head of BP Migas R Priyono (left), Director of Pertamina Karen Agus Setiawan (two left) , Governor of Jatim Soekarwo (three right), Bupati Bojonegoro Suyoto (two right) and President Car Cepu Limited (MCL) Terry Sphail (right) shows stone pellet tools during the first stone laying event symbolically the construction of oil production facilities Block Cepu in the field A Banyuurip in Mojodelik village, Ngasem District, Bojonegoro, Jatim, Tuesday (6/12). With the beginning of this Cepu Block project is estimated in 2014 the peak production of Cepu Block oil by 165 thousand barrels per day can be realized ANTARA/Aguk Sudarmojo/ed/NZ/11
Related photo
Standard
Image information
Image size
2540x1716
File size
407.84 KB
Created
06/12/2011 18:40 WIB
Photographer
Aguk Sudarmojo
Editor