MIGAS RESPONSIBILITY LOCATION IN ACEH UTARA

  • 17th January 2023
Director General of the Ministry of ESDM Tutuka Ariadji (right port) along the vanity reviewing the A-55A Well Drilling location when the job visit to North Aceh, Aceh, Tuesday (17/1/2023). PT Ke Global Energy (PGE) conducts oil and gas drilling in three dots namely two dots in Syamtalira Aron District and one point in Baktiya District, North Aceh expected to be completed July 2023 as an effort to support national energy resistance. ANTARA PHOTO/Rahmad/nym.
Related photo
Standard
Image information
Image size
4000x2617
File size
954.68 KB
Created
17/01/2023 21:05 WIB
Photographer
Rahmad
Editor
Nyoman Budhiyana