WORKING RESPONSIBILITY ANCAM RESULTS WARGA

  • 4th March 2023
People across the chanting bridge that connects several villages of Guba, Seulimum district, Aceh Besar district, Aceh, Saturday (4/3/2023. The hanging bridge that has a length of about 200 meters it has damage to the section of the floor of the board because it has been bent so that it can threaten the safety of citizens. ANTARA PHOTO/Ampelsa/foc.
Related photo
Standard
Image information
Image size
4000x2670
File size
1.59 MB
Created
04/03/2023 15:20 WIB
Photographer
Ampelsa
Editor
Fanny Octavianus