LIFTING MISSION ARCO ARDJUNA

  • 3rd April 2023 GMT+7
The officer installed 'ticket meter' (counter) at 'bank diameter' before the Floating Storage Offloading (FSO) Arco Ardjuna Pertamina Hulu Energy Offshore North West Java (PHE ONWJ) process of oil lifting to tanker ships in the northern water of Subang, Java Sea, West Java, Monday (3/4/2023). FSO Arco Ardjuna is a capacity of 1 million barrels of the oil has an important task as a facility for the raw oil production of the PHE ONWJ field which is further sent to the oil tanker to carry to the oil refinery. ANTARA PHOTO/Aditya Pradana Putra/rwa.
Related photo
Standard
Image information
Image size
4000x2667
File size
1.13 MB
Created
03/04/2023 15:20 WIB
Photographer
Aditya Pradana Putra
Editor
Puspa Perwitasari