LIFTING MISSION ARCO ARDJUNA
The officer installed 'ticket meter' (counter) at 'bank diameter' before the Floating Storage Offloading (FSO) Arco Ardjuna Pertamina Hulu Energy Offshore North West Java (PHE ONWJ) process of oil lifting to tanker ships in the northern water of Subang, Java Sea, West Java, Monday (3/4/2023). FSO Arco Ardjuna is a capacity of 1 million barrels of the oil has an important task as a facility for the raw oil production of the PHE ONWJ field which is further sent to the oil tanker to carry to the oil refinery. ANTARA PHOTO/Aditya Pradana Putra/rwa.
Related photo