BUILDING ISTANA RESPONSIBILITY
HIGH BUKIT, 27/8 - ISTANA RESPONSIBILITY. The construction of the Fenceuyung Palace in Batusangkar (Sumbar) is assessed has 65% ready, it takes 3.5 th over the cooperation of Sumbar's disposal with Dep. P&K.Rabu(27/8/1980) is still required costs around Rp.200 million again made the continuation of development, among which will be built again the Adat Hall for meeting rooms. In the picture of the appearance has been built an additional building consists of a tabuah house (Beduk), a nine-armed banana and a palace kitchen. ANTARA PHOTO/MS/s/hp/dw
Related photo