ASDP Ternate engineering interpualu trasportation schedule in Ternate

  • 12th May 2023
The condition of the connecting dock of the vehicle is ambruk at Dermaga 1 Port Ferry Bastiong, Ternate City, North Maluku, Friday (12/5/2023). PT ASDP Indonesia Ferries Ternate Branch imposes interpulse crossroad transportation schedule engineering using ferry ships while the time due to its ambruk is one of the piers assembled by KMP Mutiara Pertiwi 1 on May 10, 2023, when it will lean for loading and unloading activities. The result of the incident of the 1BAR ASDP Branch Ternate pier suffers from the fear of reaching Rp25 billion. ANTARA PHOTO/Andri Saputra/foc.
Related photo
Standard
Image information
Image size
5000x3234
File size
1.54 MB
Created
12/05/2023 15:20 WIB
Photographer
Andri Saputra
Editor
Fanny Octavianus